Bridge of the God’s Trailhead
This project included the construction of approximately 300 LF of 26-foot wide public roadway including curb & gutter, sidewalks, storm drain, sanitary sewer, dry utilities; a 11,500 sf parking lot including concrete walks, lighting, utilities; and a storm drain detention system.
Client
Port of Cascade Locks
Location
Cascade Locks, OR