This project consisted of constructing sanitary sewer, storm sewer, manholes, storm inlets and sewer laterals. Bypass pumping of the existing sanitary sewer system and connecting to the new system. Installing a dewatering system to facilitate sewer construction. Maintenance improvements and installing a pedestrian trail.